Main Features:
1.Long service life,no less than the traditional common nail making machine, for at least seven years.White belt at low cost and long life which is 5-6 months without an incorrect operation.
2.Automatic oiling , few lubrication points,much less than traditional machines and other nail making machines on market.It is still very tidy when operating.
3.High Production. Set specification 2550 as an example,about 900 kg / 8 hours.
4.No dismantle if not change nail mold specifications which can work for 3 months. Nail cutter 60 classes (8 hours / day, 2.5 wire diameter). Punch time is five times than ordinary equipment depending on the actual using status.
5.Nail cutter do cutting without touch, shear number can reach at least 800 million times (8,000,000 is the cutting times of wire diameter 2.0mm, rough wire diameter will multiplied);low consumption of nail mold, no crack, no fixed mold raw wear, no mold clogging, a single pair of nail mold can cut at least 50 million times, punching is more than 25 million times. Nail cutter, nail mold, punch can be repaired for many times at the same cost compared with general equipment.
6.Super energy-saving: actual consumption of High- speed nail making machine is about 3.5KW,1 ton nail output can save electricity about 20 degrees; while 2.5 sets of ordinary nail making machine consumption is 5-6KW due to long slide stroke and multi sliding friction parts.
7. 60% labor saving because of its high efficiency. Coiling nails efficiency gains at least 50% with a high-frequency welding machine as each nail is quality product without stuck and stop, even if in the speed of 1900 nails/min, coiling speed can improve 30%, so that can reduce 40% labor cost. 8. Seven alarming sensors can protect the machine and ensure the nail quality very well.
Detail images:
Nail parameter:
1. Nail length tolerance :0.5 MM
2. Nail head :More bigger ,more round
3. Nail point angle :Accurate angle, easy to adjust,cost less.
4. Tool :Easy to change tools,taking 20 minutes.
Packaging and shipping
1. Shipping port: Shanghai
2. Validity: within 30 days
3. Payment terms: 30% T/T down payment in advance and 70% before shipment
4. Warranty: 1 year from date of installation
5. Installation/Operation/Service/Maintenance Manual: Provided In English
6. In wooden pallet, In plastic film, the spare parts and cabinet packed by wooden box.
Our service
1. All required documents (including Installation/Operation/Service/Maintenance Manual) will be provided in English.
2. Engineer will give free training and guide to labors at customer's site if requested.
3. Commissioning charge is $150/day/engineer,and customer will be asked to provide room, meals, round-trip transportation for engineer.
4. We will offer life-long technical guide and maintenance.
5. Warranty:1year from date of installation.